Feasibility & Bankability

Feasibility studies that open the doors to financing

Our reports are structured to meet international lender and institutional investor requirements to maximize your financing chances.

Feasibility report rejected by the lender because it is not structured to their standards

Unable to raise capital due to lack of credible independent technical study

Our deliverables

Preliminary study

Rapid technical feasibility analysis to validate assumptions before any in-depth study.

Host network analysis

Assessment of the existing network's hosting capacity.

Bankable report

Feasibility report structured to AfDB, World Bank, IFC and MIGA standards.

Sensitivity analysis

Assessment of the impact of key assumption variations on technical results.

Technical due diligence

Independent review on behalf of investors wishing to audit an existing project.

Lender's engineer interface

Coordination with the lender's engineer (IFC, AfDB) throughout the financing process.

Our methodology

  1. 01

    Data collection

    Gathering of grid data, site plans, weather data and production assumptions.

    Completed data matrix

  2. 02

    Technical analysis

    Grid simulation, expected annual production calculation, constraint analysis.

    Technical analysis note

  3. 03

    Report drafting

    Structuring according to lender templates, drafting conclusions and recommendations.

    Feasibility report v1

  4. 04

    Review and validation

    Internal quality review, client comment integration, final version.

    Signed final bankable report

  5. 05

    Financing support

    Interface with lender questions, report update if necessary.

    Facilitated financing agreement

Required data

Requis

  • Project location and planned capacity
  • Multi-year weather data (irradiance, wind)
  • Local grid map and single-line diagram
  • Grid code or operator connection rules
  • Developer's financial assumptions

Optionnel

  • Previous site studies (geotechnical, topography)
  • Signed or under-negotiation PPA
  • On-site measurement data (met mast)
  • Preliminary financing structure

Typical timelines

Preliminary study

2-4 weeks

Full report

6-10 weeks

Lender review

4-8 weeks

Our quality approach

  • Compliance with IFC Performance Standards
  • Review by independent senior engineer
  • Certified software (PVsyst, HOMER, PowerFactory)
  • Reports in FR, EN and ES depending on lender

Frequently asked questions

What does a "bankable" report consist of?
A bankable report is structured to meet the specific requirements of a lender (AfDB, World Bank, IFC). It includes an independent risk analysis and conclusions robust enough to justify financing.
Can you interface directly with the lender's engineer?
Yes, this is an integral part of our service. We coordinate directly with the Lender's Engineer (LE) mandated by the lender to answer their technical questions.

Does your project need a bankable study?

Contact us to assess the study scope and receive a proposal within 72 hours.

Request a proposal