Grid Connection

Connect your installation to the grid with full compliance

From load flow study to operator validation, we guide you through every administrative and technical step of the grid connection process.

Application rejected by the network operator due to non-compliance with grid code

Commissioning delays caused by incomplete or unvalidated studies

Our deliverables

Connection note

Document summarizing the connection point, allowable power and technical conditions.

Load flow study

Network simulation with and without the project to analyze power flows and N-1 constraints.

Protection study

Definition of thresholds, time delays and protection schemes meeting operator requirements.

Short-circuit study

Short-circuit current calculation for sizing of switching equipment.

Stability study

Dynamic analysis of network behavior during load and short-circuit transients.

Operator technical dossier

Complete dossier formatted to local network operator requirements.

Our methodology

  1. 01

    Scoping

    Network context analysis, operator data collection, study scope definition.

    Technical specification

  2. 02

    Modeling

    Project integration into the network model, equipment parameterization.

    Validated network model

  3. 03

    Simulations

    Load flow, short-circuit, dynamic stability, grid code compliance calculations.

    Interim simulation report

  4. 04

    Operator dossier

    Full technical dossier drafting, formatted to operator requirements.

    Technical operator dossier (TOD)

  5. 05

    Follow-up

    Support during exchanges with the operator, response to additional requests.

    Final connection approval

Required data

Requis

  • Installed capacity and desired connection power
  • Exact project location (GPS coordinates)
  • Desired connection voltage (MV/HV)
  • Site plan and preliminary single-line diagram
  • Applicable grid code (provided by operator)

Optionnel

  • Forecast production data (P50/P90 curve)
  • Previous site studies (geotechnical, wind, irradiance)
  • Specifications of chosen equipment (transformer, inverters)
  • Planned commissioning schedule

Typical timelines

Preliminary study

2-3 weeks

Full study + TOD

4-8 weeks

Operator validation

4-12 weeks (country-dependent)

Follow-up & responses

2-6 weeks

Our quality approach

  • Independent review by a second senior engineer
  • Compliance with IEC 60909, IEC 60038, IEC 60076
  • Use of certified software (PSS/E, PowerFactory, ETAP)
  • QAQC document archiving for 10 years

Frequently asked questions

Which grid code applies to my project?
The applicable grid code depends on the distribution or transmission network operator in your country. We identify and interpret this document for you, as it is often poorly documented.
My application was rejected by the operator, can you take it over?
Yes, we analyze the rejection reasons, complete or correct missing studies and reformat the dossier to the operator's specific requirements.
Do you work on HV connections (225 kV and above)?
Yes, we have experience with HV connections up to 225 kV and collaborate with partners for higher voltages (400 kV, 735 kV in Canada via NRPowerGrid).

Ready to connect your installation?

Get a preliminary grid connection feasibility analysis within 48 hours.

Request a free analysis