Connection note
Document summarizing the connection point, allowable power and technical conditions.
From load flow study to operator validation, we guide you through every administrative and technical step of the grid connection process.
Application rejected by the network operator due to non-compliance with grid code
Commissioning delays caused by incomplete or unvalidated studies
Document summarizing the connection point, allowable power and technical conditions.
Network simulation with and without the project to analyze power flows and N-1 constraints.
Definition of thresholds, time delays and protection schemes meeting operator requirements.
Short-circuit current calculation for sizing of switching equipment.
Dynamic analysis of network behavior during load and short-circuit transients.
Complete dossier formatted to local network operator requirements.
Network context analysis, operator data collection, study scope definition.
Technical specification
Project integration into the network model, equipment parameterization.
Validated network model
Load flow, short-circuit, dynamic stability, grid code compliance calculations.
Interim simulation report
Full technical dossier drafting, formatted to operator requirements.
Technical operator dossier (TOD)
Support during exchanges with the operator, response to additional requests.
Final connection approval
Preliminary study
2-3 weeks
Full study + TOD
4-8 weeks
Operator validation
4-12 weeks (country-dependent)
Follow-up & responses
2-6 weeks
Get a preliminary grid connection feasibility analysis within 48 hours.